Faculty of Engineering, Built Environment and Information Technology
School of Engineering
Department of Industrial and Systems Engineering
Research articles in refereed specialist journals
Journal Title
Instructions
Select the first letter of the journal title from the alphabetical list.
A
E
I
O
P
S
Chandrasekhar P, Natarajan R, Yadavalli VSS: 2004. A Study on a Two Unit Standby System with Erlangian Repair Time. Asia-Pacific Journal of Operational Research, 21 (3) / Sept, pp 271-277.
Back to Top
Jeeva M, Rajagopal R, William ML, Yadavalli VSS: 2004. Expected time for attainment threshold level a shock model approach. Economic Quality Control, 19 (1), pp 97-105.
Back to Top
Yadavalli VSS, Claasen SJ, Udayabaskaran S, Geetha S: 2004. An intermittently used system with preparation time for the repair facility. International Journal of Reliability, Quality and Safety Engineering, 11 (4), pp 379-386.
Back to Top
Yadavalli VSS, Adendorff K, Erasmus GB, Chandrasekhar P, Deepa SP: 2004. Confidence limits for expected waiting time of two queuing models. Orion: Operations Research in South Africa, 20 (1), pp 1-6.
Yadavalli VSS, van Schoor CdeW, Strasheim JJ, Udayabaskaran S: 2004. A single product perishing inventory model with demand interaction. Orion: Operations Research in South Africa, 20 (2), pp 109-124.
Back to Top
Claasen SJ, Joubert JW, Yadavalli VSS: 2004. Interval estimation of the availability of a two-unit standby system with non-instantaneous switch-over and 'dead time'. Pakistan Journal of Statistics, 20 (1) / January, pp 115-122.
Mostert PJ, Bekker A, Yadavalli VSS: 2004. A two-unit intermittently used cold standby system from a Bayesian viewpoint assuming a Dirichlet prior. Pakistan Journal of Statistics, 20 (2), pp 223-2229.
Back to Top
Kapur PK, Shatnawi O, Yadavalli VSS: 2004. A software fault classification model. South African Computer Journal, 33, pp 1-9.
Yadavalli VSS, van Schoor CdeW: 2004. A perishable product inventory system operating in a random environment. South African Journal of Industrial Engineering/ Suid-Afrikaanse Tydskrif vir Bedryfsingenieurswese, 15 (2) / Nov, pp 107-131.
De Vries M: 2004. Evaluating or selecting a suitable information system development methodology: A case study. South African Journal of Industrial Engineering/ Suid-Afrikaanse Tydskrif vir Bedryfsingenieurswese, 15 (2) / Nov, pp 9-25.
Vanderperre EJ, Yadavalli VSS, Makhanov SS: 2004. On Gaver's Parallel System. South African Journal of Industrial Engineering/ Suid-Afrikaanse Tydskrif vir Bedryfsingenieurswese, 15 (2) / Nov, pp 141-147.
Ambrose GAL, Claasen SJ: 2004. A total quality management approach to civil engineering consulting. South African Journal of Industrial Engineering/ Suid-Afrikaanse Tydskrif vir Bedryfsingenieurswese, 15 (1) / May, pp 67-81.
Visser R, Claasen SJ: 2004. An operational management model for a coal mining production unit. South African Journal of Industrial Engineering/ Suid-Afrikaanse Tydskrif vir Bedryfsingenieurswese, 15 (1) / May, pp 53-65.
Joubert JW, Conradie DG: 2004. Workforce sizing and scheduling for a service contractor using integer programming. South African Journal of Industrial Engineering/ Suid-Afrikaanse Tydskrif vir Bedryfsingenieurswese, 15 (2) / Nov, pp 133-139.
Yadavalli VSS, Anbazhagan N, Arivarignan G: 2004. A Two-Commodity Stochastic Inventory System with Lost Sales. Stochastic Analysis and Applications, 22 (2), pp 479-497.
Jeeva M, Rajagopal R, Charles V, Yadavalli VSS: 2004. An Application of Stochastic Programming with Weibull Distribution-Cluster Based Optimum Allocation of Recruitment in Manpower Planning. Stochastic Analysis and Applications, 22 (3), pp 801-812.
Yadavalli VSS, Bekker A: 2004. Stochastic Model of an Intermittently Used System with Non-perpetual Vigil: Its Estimation Study. Stochastic Analysis and Applications, 22 (3), pp 813-825.
Back to Top
|